UK.Total Uk.Total Europe
Advert
Activities

As required under Regulation (EU) No 1227/2011 on wholesale energy market integrity and transparency (REMIT), this page provides information on the planned (maintenance) unavailability of infrastructure operated by Total E&P UK Limited and its affiliate Elf Exploration UK Limited, both subsidiaries of Total Upstream UK  Limited.

Whilst every effort is made to ensure that the information is given in good faith and to the best of our knowledge and belief at the time of posting, no warranty is given as to the accuracy or completeness of that information.

                                    

                                         Notification of Planned Unavailability

 

ASEP
Date of Outage
Expected Duration of Outage

Loss of Volume 

(mcm/d)

 Operator
Bacton
01/08/2012
14-17 days
Circa 10 mcm/d
Elf Exploration UK Limited

St Fergus

(Excluding Vesterled)

16/03/2012
12-18 hours
Circa 12 mcm/ d
Total E&P UK
         
         
         
         
         
         

 

Information on the unplanned unavailability of infrastructure operated by Total E&P UK and Elf Exploration UK Limited can be found on our Twitter and Facebook pages.