- ABOUT US
- OUR ACTIVITIES
- Exploration & Production
- Gas & Power
- Refining & Marketing
- Chemicals
- Geoscience Research Centre
- MEDIA CENTRE
- ENVIRONMENT AND SOCIETY
- CAREERS
- WWW.TOTAL.COM

As required under Regulation (EU) No 1227/2011 on wholesale energy market integrity and transparency (REMIT), this page provides information on the planned (maintenance) unavailability of infrastructure operated by Total E&P UK Limited and its affiliate Elf Exploration UK Limited, both subsidiaries of Total Upstream UK Limited.
Whilst every effort is made to ensure that the information is given in good faith and to the best of our knowledge and belief at the time of posting, no warranty is given as to the accuracy or completeness of that information.
Notification of Planned Unavailability
ASEP |
Date of Outage |
Expected Duration of Outage |
Loss of Volume (mcm/d) |
Operator |
Bacton |
01/08/2012 | 14-17 days |
Circa 10 mcm/d |
Elf Exploration UK Limited |
St Fergus (Excluding Vesterled) |
16/03/2012 |
12-18 hours |
Circa 12 mcm/ d |
Total E&P UK |
Information on the unplanned unavailability of infrastructure operated by Total E&P UK and Elf Exploration UK Limited can be found on our Twitter and Facebook pages.